Commissioning

Every Navvion system enters service through the same structured protocol: site-readiness verification, permit-to-work safety, recorded functional testing, punch-list acceptance, and an as-built handoff into monitoring (NavvionOS APM).

What's Included

A protocol, not a checklist on a clipboard.

Site readiness verification

Structured pre-commissioning checks — electrical completion, protection settings, network, and safety systems — before anything is energized.

Permit-to-work safety

Energization runs under a permit-to-work regime: isolation, authorization, and sign-off recorded for every energized step.

Protocolized testing

A versioned commissioning protocol per product family — every test, its expected result, and the actual reading recorded against the asset.

Punch-list acceptance

Deviations are tracked to closure on a shared punch list. Acceptance is signed against the list — not against goodwill.

Process

How a system enters service.

01

Readiness review

The pre-commissioning checklist is worked with your installer or EPC; commissioning is scheduled once the site verifies ready.

02

Safety & isolation

A permit-to-work is opened. Lockout, isolation, and authorization steps are executed and recorded before energization.

03

Energization & testing

Staged energization with protection and functional tests per the versioned protocol — every reading recorded.

04

Punch list

Deviations are logged, classified, and either closed on site or accepted with the owner's explicit sign-off.

05

Acceptance & handoff

Acceptance is signed against the punch list, and the as-built record — settings, firmware, serials, test results — hands off into Navvion APM.

Deliverables

The record your system runs on.

  • Completed commissioning protocol with recorded readings
  • Permit-to-work and safety records for every energized step
  • Punch list with closure status and sign-offs
  • Signed acceptance certificate
  • As-built record: configuration, protection settings, firmware versions, serial numbers
  • Monitoring activation in Navvion APM
Who It's For

For everyone who signs the acceptance.

  • Owners taking a new system into service
  • EPC and installer partners closing out a build
  • Asset managers who want a documented baseline from day one
Response Times

Business-day targets, stated up front.

Commissioning scheduling after readiness confirmed10 business days
Punch-list disposition report5 business days
As-built record handoff10 business days

Scheduling targets depend on region and site access; they count from confirmed site readiness.

FAQ

Common questions.

Can our own team commission the system?

Commissioning is led by Navvion or a credentialed commissioning partner. The protocol and the safety regime are non-negotiable, because the warranty baseline and the monitoring baseline both depend on them.

What happens if the site isn't ready on the day?

The readiness review exists to prevent exactly that. If a mobilized visit still finds blockers, we work the punch list on site where possible and reschedule the remainder.

What goes into the as-built record?

Final configuration and protection settings, firmware versions, serial numbers, recorded test readings, and the closed punch list — the same record APM monitoring starts from.

Does commissioning include utility witness tests?

Where the interconnection agreement requires witnessed tests, they run as part of the protocol and we coordinate scheduling with the utility.

When does the warranty start?

At acceptance sign-off, based on the as-built record — commissioning is what activates coverage.

How long does on-site commissioning take?

A single C&I cabinet is typically energized and tested in a day once the site is verified ready; containerized and utility-scale systems run multi-day per the protocol.

What happens to the punch list after acceptance?

Remaining minor items are tracked to closure post-acceptance in the same record, visible to the owner in APM — no item is lost at handoff.

Ready to energize?

Schedule commissioning and take delivery of a system with its full record attached.