System Design & Sizing

Engineering-grade sizing and system design: load-profile analysis, use-case modeling, product selection across the Navvion family — the Navvion Alpha (257 kWh) and Navvion Beta (261 kWh) C&I cabinets, the Navvion Delta utility block (3.3 MWh), the Navvion Gamma utility block (5 MWh), the Navvion Omega hybrid inverter series, and Navvion Zero — and an integration concept your installer or EPC can build from, with every assumption stated.

What's Included

Designed from your data.

Load-profile analysis

Interval-data analysis of your actual consumption — peaks, seasonality, and how your load coincides with tariff windows.

Use-case modeling

Demand-charge management, backup, solar shifting, and grid services modeled individually and stacked, so you see what each one is worth.

Product selection & sizing

Capacity, power, and product configuration chosen from measured data, with headroom and degradation assumptions stated explicitly.

Integration concept

A single-line concept, interconnection approach, and communication architecture for the recommended configuration.

Process

From load data to buildable design.

01

Data intake

You provide utility bills or interval data, site documentation, and any existing solar or generation details.

02

Load analysis

We build your load profile: peaks, base load, seasonality, and tariff exposure — the numbers every later decision rests on.

03

Scenario modeling

Candidate configurations are modeled against your use cases, with sensitivity analysis on the assumptions that actually move the result.

04

Design review

We walk your team through the recommendation and the alternatives we rejected, and fold your operational constraints back in.

05

Design package

You receive the final sizing report and integration concept — ready for proposals, permitting input, and detailed engineering.

Deliverables

A package the next team can build from.

  • Sizing report with stated assumptions and sensitivity analysis
  • Load-profile analysis of your metered data
  • Recommended configuration, with the alternatives considered
  • Preliminary single-line concept
  • Communication and monitoring architecture
  • Input package for proposals and permitting
Who It's For

For anyone who has to defend the numbers.

  • C&I customers sizing storage for a specific facility
  • Installers and EPCs who want factory-backed design behind their proposals
  • Developers and owners validating a third-party proposal
Response Times

Business-day targets, stated up front.

New request acknowledgment1 business day
Load-profile analysis5 business days
Full design package10 business days
Design review scheduling5 business days

Targets count business days from receipt of complete interval data and site documentation.

FAQ

Common questions.

What if we don't have interval data?

We can start from monthly bills and a site walkthrough; the design simply carries wider margins until better data arrives. In many cases temporary metering can close the gap.

Do you only design around Navvion products?

The load and tariff analysis is product-neutral — your meter data doesn't care about vendors. The recommended configuration uses Navvion hardware, and we say so plainly; the analysis is yours either way.

Can you review a design we already have?

Yes. Second-opinion reviews of third-party proposals are a common engagement — you get the same analysis, applied to someone else's design.

How do you handle backup requirements?

Backup is sized from the loads you designate as critical and the autonomy you require — not from the whole facility. The report separates backup capacity from economic-optimization capacity so the trade-off is visible.

Is the design package accepted for permitting?

The package is prepared as engineering input for your EPC or installer of record. Stamped drawings are produced during detailed engineering, using our package as the basis.

How does battery degradation factor into the sizing?

Degradation and warranty capacity are modeled over the design life, so year-15 performance still meets the use case — not just day one. The report states the degradation assumptions it relied on.

Can you size for future load growth or EV charging?

Yes. Headroom for load growth or planned EV charging is an explicit input, and the report separates day-one sizing from the growth headroom so you can see what each one costs.

Get a system designed from your data, not a template.

Share your load data and objectives, and get a design your team can interrogate line by line.